logo
Nachricht senden
Guangzhou Qireal Machinery Equipment Co., Ltd. 86--13826061887 Sarahlee68@163.com
Excavator Spare Parts Diesel Engine Camshaft For  C9 242-0673

Excavator Spare Parts Diesel Engine Camshaft For C9 242-0673

  • Hervorheben

    excavator components

    ,

    excavator engine parts

  • Anwendung
    LKW, Bagger, Bus
  • Produkt-Name
    Nockenwelle
  • Modell
    C9
  • Motortyp
    Diesel
  • Material
    Metall
  • Bedingung
    neu
  • Verpackung
    Neutrale Verpackung
  • Herkunftsort
    CHINA
  • Modellnummer
    C9
  • Min Bestellmenge
    1PCS
  • Preis
    Verhandlungsfähig
  • Verpackung Informationen
    Neutrale Verpackung
  • Zahlungsbedingungen
    L/C, D/A, D/P, T/T, Western Union
  • Versorgungsmaterial-Fähigkeit
    100pc/week

Excavator Spare Parts Diesel Engine Camshaft For C9 242-0673

Excavator Spare Parts Diesel Engine Camshaft For C9 242-0673

 

Our camshaft factory is a leading manufacturer of auto camshafts.

Our factory is a leading manufacturer and exporter of auto engine parts-camshaft. We produce and supply a wide range of connecting rod for cars and trucks:

 

Product Name: Camshaft
model: C9
Size: standard size
OEM NO. as original
time of delivery if instock 7-15 days or more quntity as negotiation
Engine type: for
Warranty: 6 months
Features

New

 

 

Excavator Spare Parts Diesel Engine Camshaft For  C9 242-0673 0Excavator Spare Parts Diesel Engine Camshaft For  C9 242-0673 1Excavator Spare Parts Diesel Engine Camshaft For  C9 242-0673 2

 

Packaging & Shipping
Excavator Spare Parts Diesel Engine Camshaft For  C9 242-0673 3Excavator Spare Parts Diesel Engine Camshaft For  C9 242-0673 4Excavator Spare Parts Diesel Engine Camshaft For  C9 242-0673 5Excavator Spare Parts Diesel Engine Camshaft For  C9 242-0673 6

About our packing

1.Neutral bag+foam bag+neutral carton(pallet) or customized packing.

2.We accept customerized brand packing if the quantity is good.

3. then it will be put into box, and all cam shafts are packed in cartons finally.

4.All of the products are well packed.

5.Delivery time is 15-60 days as normal.